Skip to main content
Contract production and export for HoReCa projects
Café, restaurant and hotel furniture for Tunisia

Export · Tunisia

Café, restaurant and hotel furniture for Tunisia

At a glance

Last updated:

Transport
Sea freight in 20' or 40' HC containers
Ports
Radès (Tunis), Sousse or Sfax
Typical transit
Usually 1–2 weeks from a Turkish port
Incoterms
EXW Istanbul or FOB Turkish port
Lead time
Usually 4–6 weeks
Minimum order
1 piece

From the cafés of Tunis to the beach hotels of Sousse, Hammamet and Djerba, Tunisia's hospitality sector refreshes its venues every season. Livinya manufactures the chairs, bar stools, armchairs, sun loungers and garden sets for these projects in Istanbul and ships them by container to Tunisian ports.

Turkey and Tunisia have a free trade agreement, and with an EUR.1 certificate a preferential rate can apply. Since 2024, however, some Turkish industrial goods with locally made equivalents carry an additional duty; your customs broker confirms the rate for each product.

Why Livinya

  • Beach hotels

    Aluminium chairs, sun loungers and garden sets for pool decks and seafront terraces.

  • Season planning

    Production is planned back from the season opening, with sample approval done early.

  • French and Arabic support

    Quotation, documents and project follow-up in French, Arabic or English.

How an order works

  1. 01

    Quote

    Send the models and quantities; we reply in writing with price, lead time and delivery terms.

  2. 02

    Sample

    Order a sample or a single piece first if you like, and approve the finish and fabric.

  3. 03

    Production

    After approval, production usually takes 4–6 weeks.

  4. 04

    Shipping

    We pack in cartons and on pallets and prepare the invoice, packing list and certificate of origin.

  5. 05

    Delivery

    EXW, FOB or door delivery; customs clearance is handled by your importer or customs broker.

Logistics and delivery

Transport
Sea freight in 20' or 40' HC containers; groupage (LCL) for smaller orders.
Ports
Radès (Tunis), Sousse or Sfax, depending on your project and customs broker.
Typical transit
Usually 1–2 weeks from a Turkish port, depending on the sailing.
Incoterms
EXW Istanbul or FOB Turkish port; CFR/CIF to a Tunisian port on request, confirmed in writing in the quotation.

Documents and standards

  • Commercial invoice, packing list and bill of lading.
  • EUR.1 movement certificate for the preferential rate under the Turkey–Tunisia free trade agreement.
  • Since 1 January 2024, Tunisia applies an additional duty of 75% of the standard rate to some Turkish industrial goods with locally made equivalents; your customs broker confirms duties and taxes by HS code before shipping.

Frequently asked questions

How is furniture shipped from Turkey to Tunisia?

By container from a Turkish port to Radès, Sousse or Sfax. Transit usually takes 1–2 weeks depending on the sailing.

When should we order for the season opening?

With 4–6 weeks of production, sample approval and shipping, order at least 10–12 weeks before opening.

Is Turkish furniture duty-free in Tunisia?

A preferential rate can apply under the free trade agreement with an EUR.1 certificate, but since 2024 some products with locally made equivalents carry an additional duty. Your customs broker confirms the exact rate by product code.

Is there a minimum order?

No. Orders start from a single unit.

Get a quotation for your project

Add models to your quote list or message us on WhatsApp. Orders start from a single unit; production usually takes 4–6 weeks.

2026 catalogue (PDF, English)

Talk to us directly

Write to our B2B line for wholesale and project orders, or to our architecture line for architectural projects.