Skip to main content
Contract production and export for HoReCa projects
Hotel and lobby furniture

Sectors

Hotel and lobby furniture

A hotel needs seating for many different spaces: the restaurant, lobby, bar, meeting rooms, rooms and terrace. Livinya produces contract chairs, armchairs and bar stools for all of them, with one finish language across the project.

We work from your interior designer's specification, confirm fabrics and finishes with samples, and plan production and shipping around your opening date.

Product groups for this sector

What to plan for

  • Fire safety

    Hotels and public areas often require fire-retardant fabrics and fillings to a national standard. Share the required standard at quotation stage so the right materials are used.

  • Durability and maintenance

    Restaurant and breakfast-room chairs are used all day. Choose strong frames, stain-resistant upholstery and replaceable seat pads.

  • One design language

    Using related models in the restaurant, lobby and bar gives the hotel a consistent look while each area gets the right comfort level.

  • Opening schedule

    Agree samples and fabric approval early; production usually takes 4–6 weeks after approval, plus shipping time.

Frequently asked questions

Can you produce with fire-retardant fabric?

Yes. We use certified fire-retardant fabrics to the standard in your specification, or produce with the customer's own material (COM).

Do you work with interior designers?

Yes. Send the specification and drawings; we confirm fabric, colour and finish with a sample before series production.

Can you supply the restaurant, lobby and terrace in one order?

Yes. Dining chairs, lobby armchairs, bar stools and outdoor models can be produced and shipped together.

What is the lead time?

Production usually takes 4–6 weeks after sample approval; the exact schedule is confirmed in writing.

Get a quotation for your project

Add models to your quote list or message us on WhatsApp. Orders start from a single unit; production usually takes 4–6 weeks.